CONX ORBIT — FACADE REVISION REVIEW TEST
Synthetic concept data. Not a construction or fabrication package.

1. Open IFC workspace. Load the built-in 12-storey complex tower, or import
   01_Previous/ConX_Complex_Tower_IFC4.ifc.
2. Schedule -> Load tower schedule -> Apply matches, or upload the CSV below.
3. Drawings -> Load tower drawings, or upload the four supplied PDFs.
4. Compare revisions -> Load tower Revision B, or upload the IFC in 02_Revised.
5. Select CT-L10-S-005: width 1400 -> 1500 mm, olive -> bronze finish.
   Its unchanged schedule conflicts with Revision B. CT-101_A.pdf needs review.
6. Try Previous/Revised/Changes, isolate, floor filters and cutaway.
7. Add a review status and a note. Export the change register.
8. Sign in BEFORE starting if you want Save project / My projects persistence.

Expected: 11 modified, 2 added, 2 removed, 2937 unchanged, 0 unmatched.
Expected_Changes.json lists every intentionally changed component ID.
The first panel is moved to test preservation of coordinates across exports.
PDFs are reference identification sheets. The app flags their associations;
it does not read/validate drawing geometry or issue engineering approval.
This fixture includes deliberate inconsistencies for review testing.